Here is the last email I got from my supplier on the 18th
QUOTE
The first 1000pcs main boards did arrive last week and this is not the problem so at least that is some good news that the main hardware has been produced and is continuing to be produced as we speak, the email we received was that first the USB cables that needed to ship with the final product had substandard insulation and they had to re-order from another supplier, sounded like those were going to arrive early next week. The second problem they had was with the MicroSD memory cards, each x360key is going to ship with a 128mb MicroSD memory card that holds your drive key etc. Their stock of these MicroSD memory cards arrived this week shortly after the main boards, but unfortunately the majority of them were faulty, they have had to order an entire new batch of those, they didnt give us any eta on those but we assume its not going to take long to track down MicroSD memory cards. We guess some good news is that they are testing everything before they ship and were able to find these problems before we received and sent out to customers.
The wait has been a test of everyone's patients.
Sounds like they have ironed out all the bugs though and its only down to a few extra components that need to be acquired. I'm pretty confident the first thousand units should ship out this week.
If it doesn't happen then at least they will have more units from the second run to ship when they are ready next week.