Ok this is a long one but stick with me.
This is how it went down for me.
8/04 Ordered xpod
11/04 received xpod
6/05 sent email about getting extra screws
8/05 posted here about extra screws
9/05 got extra screws.
Now as bad as that can look, its really not. During the time between ordering and receiving my xpod, I would get an email from xport1 every other week, explaining the hold up. Having the xpod for almost a year now, I come to the conclusion that I wouldnt have minded waiting longer, this thing is more than I could hoped for. I can fit FOUR hard drives in this thing, and it is nowhere as ugly as the xtender.
Now a bit of economics 101
Xport1 is a small company. They specialize in etching windows for computers. When they came up with xpod and soon realized it was a very demanded product. From there they had three choices:
1. Sell the idea to a larger company
2. heavily invest in equipment for a production line business
3. continue making them using there current equipment
Now 1 is a bit out there most likely ending with the least amount of profit for xport. 2 seems like the right choice at first but inevitably could bankrupt xport1, so they went with three.
The xpod, although heavily demanded right now, is a limited product. When the xbox360 takes over the market, people will lose interest in the xpod, and orders will dwindle to nothing. There best bet was use the equipment they already own to produce the xpod. Although it severely slows the production of the xpod, it maximizes the profit for xport1. Not to mention the delays attributed to other companies ignoring xport1 because of their size. I know they had a problem with the company that made the cubes in the corners.
So what does this all mean?
The xpod is a great product, and I would recommend it to anyone.
Be patient, It will take a while for you to get your order, and trust me, it is worth the wait.